Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 5 results ...

Akbari, S, Khanzadi, M and Gholamian, M R (2018) Building a rough sets-based prediction model for classifying large-scale construction projects based on sustainable success index. Engineering, Construction and Architectural Management, 25(04), 534–58.

Ismail, Z B (2018) Improving contractor social networking on IBS infrastructure maintenance projects: a review. Engineering, Construction and Architectural Management, 25(04), 479–96.

  • Type: Journal Article
  • Keywords: Innovation; Technology; Integration;
  • ISBN/ISSN: 0969-9988
  • URL: https://doi.org/10.1108/ECAM-08-2016-0180
  • Abstract:
    A key factor adversely affecting contractor social networking performance is the improper handling and information management of contractor’s services delivery on websites. Contractor social networking is particularly problematic on industrialised building system (IBS) infrastructure maintenance projects where contractor’s certified quality product and firms are not matched with maintenance specialisation services. The paper aims to discuss this issue. Design/methodology/approach This paper reports on the early stages of research which is developing a new information and communications technology (ICT)-based approach to managing contractor social networking on IBS infrastructure maintenance schemes. As a precursor to this work, the paper reviews current contractor social networking websites practices on IBS infrastructure maintenance projects and explores the ICT tools and techniques currently being employed on such projects. Findings The findings reveal the need for more sophisticated contractor social networking websites solutions which accord with the needs of IBS infrastructure maintenance schemes. Originality/value The paper concludes by presenting a research framework for developing such a system in the future.

Li, J, Yu, M and Wang, H (2018) A taxonomy of performance shaping factors for shield tunnel construction. Engineering, Construction and Architectural Management, 25(04), 574–96.

Mahjoubpour, B, Nasirzadeh, F, Mohammad Hosein Zadeh Golabchi, M, Ramezani Khajehghiasi, M and Mir, M (2018) Modeling of workers’ learning behavior in construction projects using agent-based approach. Engineering, Construction and Architectural Management, 25(04), 559–73.

Shahsavand, P, Marefat, A and Parchamijalal, M (2018) Causes of delays in construction industry and comparative delay analysis techniques with SCL protocol. Engineering, Construction and Architectural Management, 25(04), 497–533.